Process plant and pipework at Devonport Royal Dockyard

Process plant and pipework at Devonport Royal Dockyard

Process plant and pipework at Devonport Royal Dockyard

 

Process Plant & pipework at Devenport

The reactor access housing (RAH) project at the Devonport Royal Dockyard, Plymouth provides new defueling plant, process and environment for Swiftsure and Trafalgar class submarines. Under the Medical Gases name UK Gas Technologies installed the process plant and pipework for five systems on the RAH and dockside.

Project: RAH Build, Plymouth

Client: Balfour Beatty Engineering

Value:  £255,000

Laboratory gases for Pirbright Institute

Laboratory gases for Pirbright Institute

Laboratory gases for Pirbright Institute

 

Pirbright Institute

The Pirbright Institute, formerly known as the Institute for Animal Health, is a world leading centre of excellence in research and surveillance of virus diseases of farm animals and viruses that spread from animals to humans. Puretech was responsible for the supply and installation of gas systems at the Institutes new CAT4 facility.

 

Project : Institute of Animal Health, Pirbright, Surrey
Client : Shepherd Engineering Services
Value : £160,000

 

hdrlogo

Turnkey water system for Aesica Pharmaceuticals

Turnkey water system for Aesica Pharmaceuticals

Turnkey water system for Aesica Pharmaceuticals

 

AesicaIn 2013 Aesica, supplier of Active Pharmaceutical Ingredients (API) and finished dose manufacturing to the pharmaceutical industry, unveiled its new high capacity manufacturing facility specifically built to produce a solid dose medication for treating Type 2 diabetes in adults. Puretech supplied the turnkey water system for the facility, including pre-treatment, 3mr/hr Oasys, 10,000 litre storage vessel and 2″” hot water system distribution skid and pipework.

 

Project : Aesica
Client : Scitech Engineering
Value : £325,000

 

Aesica