Aesica

AESICA-site-validation

In 2013 Aesica, supplier of Active Pharmaceutical Ingredients (API) and finished dose manufacturing to the pharmaceutical industry, unveiled its new high capacity manufacturing facility specifically built to produce a solid dose medication for treating Type 2 diabetes in adults. Puretech supplied the turnkey water system for the facility, including pre-treatment, 3mr/hr Oasys, 10,000 litre storage vessel and 2″” hot water system distribution skid and pipework.

Project : Aesica
Client : Scitech Engineering
Value : £325,000

 

Aesica